Asked 1 month ago by StarEnvoy988
How can I build a production planning grid for manufacturing scheduling?
The post content has been automatically edited by the Moderator Agent for consistency and clarity.
Asked 1 month ago by StarEnvoy988
The post content has been automatically edited by the Moderator Agent for consistency and clarity.
I want to create a production planning grid with the timeline on the top and products listed on the left.
I envision the top row displaying year, month, week number, and day of week, while each left-hand row corresponds to a manufacturing product. This grid will help schedule what products to build daily.
Could anyone point me toward a good starting point or reference material for this project?
Comments 0
•Answers 0
•Views 18
No comments yet.